Metal is usually installed on rafters or strip sheathing rather than the solid decking used under other materials.
How far should roof sheathing overhang fascia.
The size of the roof overhang you choose depends largely on the style of your shed s roof.
Roof drip edge is important for proper roof installation to avoid leaks and to give a straight edge to the roof eaves and gable ends.
On my shed my sheathing does not protrude actually how both my house and shed are done is a 1 x 6 house 1 x4 shed fascia is installed to end of rafters then 1 x 1 1 2 is tacked onto the fascia at the top.
In some places the sheathing just doesn t have sufficient overhang for the fascia.
Here is the problem the lookouts are already in place the sheathing is installed.
Fascia and soffits finish the edges of roofs by covering the ends of the roof rafters or roof trusses where they overhang the sides of the house the fascia is the wide board that s installed on edge and runs horizontally along the edge of the roof.
Because this style of a shed has a flat roof it can facilitate a wider overhang which is ideal for storage.
Roof drip edge specifications are given here.
This is to just enough to cover the 3 4 x6 actual fascia.
With a flat shed roof the roof simply extends past the wall plate to provide an overhang.
How to install drip edge.
A typical metal roof overhang may be 2 to 4 inches or even less.
Then i do a metal drip edge to cover it all.
Roof sheathing overhang on fascia.
Its top edge is tucked up under the shingles and its outside face is where the gutter is mounted.
The lower edge of a roof should extend beyond the fascia board by about 3 4 inch so that runoff drains into the gutters.
I ve trimmed my roof sheathing to run between 5 8 and 3 4 over the sub fascia.
We go in depth on how to install roof sheathing.
Starting with how to place the first row of sheathing we cover fastening methods the use of h clips stagg.
Now that i ve modeled what i was going to build i decided i need a piece of molding to break up the plain look of just the fascia trim plank.
This indicates the upper edge of the first row of roof sheathing leaving enough overhang that the subfascia and fascia will tuck neatly underneath when the time comes.
How far should a drip edge be from fascia.
The roof sheathing comes down and ends on top of the 1 x fascia.
Roof underlayment requirements over drip edge.
I know that the fascia should go below the roof sheathing but what about placing the fascia even with the sheathing.
If this slight overhang is too short water will drip behind the gutters leading to rotted roof sheathing and fascia stained siding and even soil erosion and a flooded basement.